“Arada” launches third phase of “Massar” project in Sharjah

Sharjah: “Golf”
Arada recently launched the community of Robinia, the third residential phase of Massar; The modern luxury destination in the green nature of Sharjah, in response to the growing demand among investors for spacious, nature-inspired homes distinguished by their high quality. The launch of these 565 residential units, villas and country houses in Robinia, was offered after the sale of the first two residential phases of the project.
The total value of the Masar project is 8 billion dirhams, and includes 4,000 homes in eight fenced communities connected by a central green as enclosing 50,000 trees. Masar received wide positive reactions. The project has become the top-seller off-plan project since its launch in January 2021 in Sharjah.
The residential options in Robinia range from two-bedroom cottages to luxury five-bedroom villas, and these homes have been carefully designed to provide its residents with an integrated, luxurious and contemporary lifestyle. The green environment of the houses and the exceptional sports and leisure facilities encourage a healthy and active lifestyle. The living units are equipped with the standard technologies of smart homes, including access control, temperature and lighting to provide the greatest comfort to the residents, while the villas in this modern community have more privacy, additional halls, spacious balconies and magnificent swimming. swimming pools. All Robinia units are scheduled to be completed by the second quarter of 2024.
Visitor center opening
Ahmed Al-Khushaibi, Group CEO of Arada, said: “The Masar project has attracted the interest of many buyers and investors of different nationalities thanks to its distinctive design, strategic location and high-quality homes that add value to its owners. Therefore, we are delighted to launch the sale of the third phase, Robinia, in this luxury residential community with a focus on raising the concepts of health and sustainability for families who value life in vibrant modern communities that their provide residents with the highest quality standards. within natural environments with a range of exceptional service facilities. ”
Al Khushaibi added: “We are about to open the Masar Visitor Center and the surrounding area during the month of June, to provide an opportunity for everyone to see what such an integrated community can offer, a different flavor add and set new standards for modern lifestyles in the Emirates. ”
network of roads
The trail is designed so that residents can enjoy a lifestyle in harmony with nature, thanks to the tree-shaded hiking trails, as well as the scenic landscape. The sports facilities distributed by the community include a 13 km network of continuous routes dedicated to professional joggers and cyclists in a dense tree-lined environment.
Families of residents will enjoy walking, hiking, running, cycling and meditating within spacious green spaces irrigated with recycled water through a modern irrigation system designed to the highest international standards. The community includes nine different parks with many swimming pools and various sports facilities, while the entertainment district in the heart of Masar will include a shopping center, fitness club and a range of excellent restaurants and cafes.
The Masar Visitor Center will be completed during the month of June. So that it will be the first part that is opened to the public. At the same time, a corner of restaurants, a play area and adventures for children and a skating rink will be opened, as well as a showroom in the project.
The first Masar contracts were awarded in May last year, including the contract for infrastructure design, supervision and consulting services, won by the American engineering consultant Parsons, and the contract for the construction of the Masar Visitor Center and Showroom, which is awarded to Al Shafar General Contracting. Also last March, two more contracts for infrastructure development and landscaping were awarded in the central area around the Masar Visitor Center and the buffer zone around the residential community.
In May, Arada also awarded two large contracts with a total value of 460 million dirhams for the construction of Oak, the first residential phase of the project. Work began immediately; Construction is expected to be completed within 14 months. The contracts for the second and third residential phases, Kaya and Robinia, will be awarded by the end of the third quarter of this year.
It is worth mentioning that the Massar community is located in the growing suburb of Al-Suyoh, near the city of Tilal, the Sharjah Grand Mosque, and the first Arada project, Nasma Residences. This modern community has easy access to Emirates Road and Maliha Road, and is only a 15 minute drive from Sharjah International Airport and 20 minutes from Dubai International Airport. The location is also characterized by the smooth movement of traffic from Sharjah to Dubai and the rest of the northern emirates.

Leave a Comment